X

AASHTO Steel Tunnel Liner Plate spreadsheet

Engineering Excel Spreadsheets & Templates

 
  • Filter
  • Time
  • Show
Clear All
new posts
  • Saadedin
    Thread Author
    Administrator
    • Sep 2018 
    • 35978 
    • 18,815 
    • 2,851 

    AASHTO Steel Tunnel Liner Plate spreadsheet

    Smooth-back tunnel liner plate in soft ground

    Purpose:
    To design an initial liner for a tunnel using steel liner plate.
    Hoop thrust capacity of the liner is checked for a specified overburden pressure, hydrostatic pressure, and live load
    pressure, which consists of either AASHTO H-20 Truck Loading or Cooper E-80 Train Loading (Per AREl\/lA).

    Assumptions/ Limitations:
    ~ Surrounding ground consists of granular or cohesive soil (Not rock)
    Tunnel support is 2-flange or 4-flange, smooth-back liner plate.
    » Liner plate joints (flanges) are non-compact (not slender)


    Attached Files
  • aboabdullah
    Free Membership
    • Nov 2018 
    • 69 

    #2
    شاكرين الاخوة على الجهد
    Comment
    • mohammeddia
      Free Membership
      • Nov 2018 
      • 88 

      #3
      شكرا جزيلا
      Comment
      • saaaaaam
        إداري - إجازة
        • Nov 2018 
        • 971 
        • 1,631 
        • 1,501 

        #4
        الله يعطيك العافية بارك الله فيك

        مجهود يستحق الشكر

        Comment
        Working...
        X