    Design and Construction of Driven Pile Foundation




    FOREWORD

    The purpose of this report is to document the issues related to the design and construction of driven pile foundations at the Central Artery/Tunnel project. Construction issues that are presented include pile heave and the heave of an adjacent building during pile driving. Mitigation measures, including the installation of wick drains and the use of preaugering, proved to be ineffective. The results of 15 dynamic and static load tests are also presented and suggest that the piles have more capacity than what they were designed for. The information presented in this report will be of interest to geotechnical engineers working with driven pile foundation systems.

    Gary L. Henderson Director, Office of Infrastructure Research and Development


    Download
    *
Working...
X