Construction of Fills 2nd Edition by Edward Monahan
The title of the second edition has been changed to reflect the fact that most of the additions deal with fills that are not compacted.
The major new work is Chapter 9, Septic Systems, which includes descrip- tions of the sequential steps of this important technology: Site Investigation and Evaluation, and Design and Construction, followed by three aspects of
Copyrighted Material
attention to existing systems: Renovation and Repair, Maintenance, and Sys- tem Management. Emphasis is given to Site Investigation and Evaluation and to Maintenance because it is my feeling that these aspects of the technology are not usuallygiven the attention they deserve. I also feel that proper attention to these neglected aspects can yield the best return for the least expenditure of
time, cost, and effort, both in terms of return on investment and with respect to the protection of the environment.
Extensive new material has been added in Sections 5.2 and 5.3 concerning
Download
*