Analysis of Cable-Stayed Bridge with Ansys
Basic calculations and design of the bridge carried out “Giprotransmost”, but the design and construction of this unique artificial structures preceded research, which involved scientists Chairs “Bridges” and “Structural Mechanics”, Moscow State University of Railway Engineering (MIIT), and several other TsAGI organizations. MIIT scientists carried out a large range of activities and checking calculations to evaluate the stress-strain state of the cable-stayed bridge span in the individual stages of installation and operation. They performed static calculations of cable-stayed span in linear and nonlinear formulations of the problem based on the sequence of mounting the stage of construction and operation. The behavior of the span when wind impacts. Some fragments of the superstructure and the pylon designed as thin-walled space of local exposure to guys. In the formulation of the problem of volume calculation is made eye fastening guys to span. Calculations are made using finite element method using the software package ANSYS.
Download
*