X

Scour at Contracted Bridges

Engineering Library

 
  • Filter
  • Time
  • Show
Clear All
new posts
  • Saadedin
    Thread Author
    Administrator
    • Sep 2018 
    • 35991 
    • 18,821 
    • 2,851 



    Scour at Contracted Bridges

    ABSTRACT

    The main purpose of NCHRP Project 24-14 was to collect field data from which

    processes affecting scour magnitude in contracted bridge openings could be identified, to support verification of physical and numerical model studies, and to improve guidelines for applying scour-prediction methods at contracted bridge sites. The objectives were accomplished by the collection and analysis of data at 15 bridge sites. A combination of real-time and post-flood data collection activities provided comprehensive field data sets. Detailed directional velocity data were collected throughout the reaches affected by the bridge where flood and site conditions permitted (4 of 15 sites). In addition, streambed, stream bank and floodplain material properties were described. Raw data were reduced and assembled into a database accessible through the World Wide Web.





    Download
    *
Working...
X