X

Method Statements for Construction Works

Engineering Library

 
  • Filter
  • Time
  • Show
Clear All
new posts
  • Saadedin
    Thread Author
    Administrator
    • Sep 2018 
    • 36096 
    • 18,862 
    • 2,860 

    Method Statements for Construction Works










    Content

    Installation of Temporary and Interim Security Fence

    Dewatering

    Surveying work

    Sub base and gravel base

    storm water and drainage earthwork

    GRP Pipes laying

    Pipes Installation

    Excavate to locate

    Future and Split Ducts

    Cast in situ storm water mahole

    Pipelines with concrete surround

    Erecting sandwich panels

    Ducts for fire and water pipes

    Cast-in-place chambers

    Excavation and preparation of formation level runway

    Placing of bituminous pavement

    Excavation and foundation preparation of box culvert

    protection of existing gas pipelines

    Construction of AGL Ducts

    Placing of Select Fill

    Casting of blinding concrete & installation of precast

    Casting of blinding for box culvert & installation of

    Placing Subbase & Gravel Base by Paver

    Construction of Open Concrete Formed Channel

    Open Grouted Riprap Formed Channel (Type )

    Production of As-Built Drawings

    Backfilling of box culverts and associated structures

    Excavation and foundation preparation forbuilding struct

    Construction of blinding concrete for building structure

    Construction of Cast-in-Situ Concrete for Building

    Backfilling of precast units

    Construction of north stormwater retention pond and over

    Backfilling of building structures

    Placing of Surface Protection Material

    Using ISOLA N-S Grout (Non-Shrink, Non-Metallic Grout)

    Excavation and backfilling at new dvor location

    Grouting of pipes in stormwater single and double pipe c

    Sub-Surface Delethalisation of Infrastructure

    Geophysical survey – cavity area

    Asphalt Compaction Trials

    Surface Friction Treatment Trial (Base Option)

    Drilling of boreholes for geophysical investigation

    Installation of Covers and Frames for Chambers and Pits

    Method Statement for Horizontal Directional Drilling

    Laying of mm Dia. AGL Ducts in Existing Construction

    Method Statement for Block Works

    AOA Construction – Cancellation of Existing mm AC Wat

    AOA Construction – Installation and Connection of mm

    AOA Construction – Installation and Connection of mm

    Rendering Works for Building Works

    Installation of Communication Sub-Ducts

    AOA safety plan for construction of taxiway lima interse

    Casting of blinding concrete & installation of precast b

    Construction of Concrete Open Channel Type a & b

    Backfilling of box culverts







    Download

    *

  • chienluocgia3
    Free Membership
    • Nov 2018 
    • 17 

    #2
    Thank you.
    Comment
    • butcher008
      Free Membership
      • Oct 2018 
      • 18 

      #3
      شكراً جزيلا ملف اكثر من رائع
      Comment
      • xawlynnplus
        Free Membership
        • Feb 2019 

        #4
        Thanks
        Comment
        • Kumait
          Gold VIP
          • Sep 2018 
          • 20 
          • 20 

          #5
          شكرا جزيلا
          Comment
          Working...
          X