Sticky topic.
X
X

Quantity Surveying Building Estimation BBS with Excel & CAD - 12.2GB

Engineering Lectures & Courses

 
  • Filter
  • Time
  • Show
Clear All
new posts
  • Saadedin
    Thread Author
    Administrator
    • Sep 2018 
    • 36124 
    • 18,869 
    • 2,862 

    Quantity Surveying Building Estimation BBS with Excel & CAD

    Quantity Surveying,Manual Quantity Take off For Steel, Concrete, Bricks,Cement, shuttering ,B.O.Q, Excel , Bar Bending




    What you'll learn:
    Quantity Survey, Estimation & Costing Of Industrial Building & Hostel Building Of G+2 ( Excavation To Finishing )
    Able to take Entry level Jobs As a Quantity Surveyor & Estimator
    Bar Bending Schedule Of Footing, Column, Beam & Slab (Foundation To Roof Level)
    Preparing Boq For Pcc, Excavation, Plastering, Concreting, Tmt Steel Etc
    Basic Rate Analysis For Various Items ( PCC, RCC & SHUTTERING )
    Quantity Estimation For Sump Tank & Flag Pole Foundation
    Thumb Rules For Quick Calculations Of Shuttering Materials, Concreting , Centering, Plyboard & Props Required
    Excel Basic Commands And How To Prepare & Use Excel Sheets For Quick Calculations
    Case Studies Of 5bhk House With Interiors Estimation
    Become a Quantity Estimator & Estimate Any Building Like Professional
    Estimate any Building or House Plans with Quick thumb Rules
    Quantity Estimation Of Brickwork, Blockwork, Plastering, Painting, Electrical Tiling Etc

    Requirements
    PATIENCE TO LEARN

    Description
    OVERVIEW OF COURSE

    SUB STRUCTURE QUANTITY TAKE OFF ( EXCAVATION, SAND FILLING, PCC, BACK FILLING OF FOOTING & COLUMN TILL PLINTH BEAM LEVEL )

    SUPER STRUCTURE QUANTITY TAKE OFF ( PLINTH BEAM,FLOOR BEAM, FLOOR SLAB , ROOF BEAM, ROOF SLAB )

    FINISHING ACTIVITIES ( PLASTERING, WALL PUTTY, PAINTING , CEILING PLASTERING, CEILING PUTTY, WALL PAPER, ELECTRICAL ETC )

    ESTIMATION & COSTING OF DOG LEGGED STAIRCASE

    COMPLETE ESTIMATION & COSTING OF G+2 HOSTEL BUILDING ( EXCAVATION, BACK FILLING, PCC, FOOTING, BEAM, SLAB & STAIRCASE )

    BAR BENDING SCHEDULE

    Bar Bending of Isolated & Combined Footing

    Bar-bending Schedule Of Column Necks And Columns up to G+2 ( Manual + Excel )

    Bar-bending Schedule Of Simply Supported Beam, Continuous Beam, Top Extra, Bottom Curtail & Side Face Reinforced Beams

    Bar Bending Schedule Of One way Slab, two way Slab, one way Continuous Slab ( Manual + Excel + PPT)

    RATE ANALYSIS FOR VARIOUS WORKS

    Rate Analysis for PCC

    Rate Analysis for RCC

    Rate Analysis for Brickwork

    Rate Analysis for Block work

    Rate Analysis for wall Plastering

    Rate Analysis for ceiling Plastering

    Rate Analysis for Tiling

    Rate Analysis for Reinforcement Works

    Thumb Rules for Quick Calculations of Shuttering & Concrete Materials

    Thumb rule for finding Footing Shuttering Quantity with footing Concrete Quantity.

    Thumb rule for Finding Beam, Column & Slab Shuttering & Centering Quantity with Concrete Quantity.

    Quick thumb rules for finding Steel for Slab, Beam, Column .

    Bill Of Quantity (B.O.Q)

    BOQ For Excavation & Back filling of Soil

    BOQ For PCC, Concrete( M-15, M-20 ) & TMT Steel

    BOQ For all Finishing Activities ( Plastering, Brickwork, Wall putty , ceiling Plastering, Painting etc )

    MISCELLANEOUS LECTURES

    Estimation & Costing of Under Ground Water tank of 50 Kl ( EXCEL CALCULATIONS )

    Estimation & Costing of Flag pole Foundation ( Raft Foundation & RCC Pedestal Covered )

    Estimation & Costing of 5 BHK House Plan with all Interiors ( Case Study )

    All Explanation has Been done with Live Project Photos & videos .

    Who this course is for
    QUANTITY ESTIMATORS, BAR BENDERS, CIVIL ENGINEERS, STRUCTURAL ENGINEERS, PLANNING ENGINEERS, QUANTITY SURVEYORS , PROCUREMENT ENGINEERS
    EXCEL LEARNERS


    MP4 | Video: h264, 1280x720 | Audio: AAC, 44.1 KHz, 2 Ch
    Genre: eLearning | Language: English + srt | Duration: 164 lectures (20h 55m) | Size: 12.2 GB

    Download

    *
Working...
X